Construction Link Plan | At the time of Allotment/Booking | 10% |
Excavation | 10% |
At Plinth level | 20% |
Casting of Ground Floor Slab | 15% |
Casting of First Floor Slab | 15% |
Casting of Second Floor Slab | 10% |
Casting of Third Floor Slab | 10% |
Fit Out | 5% |
Possession Time | 5% |